When the equipment is lifted, the loading winch directly bears more traction. Whether its installation is stable and correct will endanger lifting safety. We need to pay enough attention to this. The following is the introduction of the installation and precautions for the use of the loading winch manufacturer:
1, the loading hoist should be installed in a flat, open place, there should be no obstacles in front. The operator should be able to directly observe the lifting process of the equipment, while receiving command signals.
2. The installation position of the loading hoist should be far away from the lifting center. For example, when lifting with the mast, the distance should not be less than the height of the mast.
3, the distance between the guide block and the scroll axis should be greater than 25 times the length of the scroll to ensure that the deflection Angle a<2°. The scrolls need to be arranged in order.
4. The fixing of the loading winch installed by the manufacturer should be reliable to prevent overturning and moving. Ground anchors, workshop plinths and weights are usually used as anchor points. The fixing rope for the base of the loading hoist should be pulled out from both sides to prevent the base from moving after being stressed.
5, using the method of adjusting the position of the guide wheel, so that the traction wire rope from the bottom of the drum into the drum horizontally.
6. The crane is strictly used and overloaded. When lifting heavy objects, a dynamometer should be installed on the traction rope to measure the tension value at a lower tension.
7, the hoisting machine manufacturers remind you that the mechanical equipment and electrical system of the crane should be checked before use. The mechanical device should be fully lubricated, the action is flexible, the sound is normal, especially the brake should be well sealed and reliable. The electrical system is well insulated, the control switch is flexible, and the switch is used correctly.
8. When hoisting heavy lifting equipment for test lifting, please check the power and stability of the loading winch, the tension of the traction rope and the current value of the motor. It should also be checked whether the rope head is firmly fixed on the drum, and whether the initial number of ropes exceeds 3 turns.